Planning
Pre-engineering tasks
- Waste audit or inventory of available wastes on-site, in proximity, and within 10 mile radius
- Risk assessment of waste availability long term vs. short term for the life of the project
- Risk assessment of long term contractual agreements with the local authority, ie. commissions, councils, departments
- Short term receiving options, costs associated with this on call option.
- Number of short-term contracts necessary for quantity required for operation
- Logistics - time, and size of delivery truck off-loading, rinsing, cleaning, and sanitizing, volumes to be treated, etc.
- On-site and off-site transportation of wastes, residues, and byproducts
- By product/end-user market profile
- Assessment of relative economies of retail (value added + packaging) vs. bulk wholesale
- Addressing environmental issues of the local regulatory agencies
- Local utility cost-avoided rate contracts for independent power producer
- Parallel service hook-up fees and administrative costs
- Identifying hidden costs, i.e. delays typical in waste producing industry, long term plans for shut down, continuation, and /or expansion of producers
- Mixed waste facility - byproduct review of current recycle market costs of typical rates paid by receivers/consolidators
-
Consulting
- Project Development and/or Management
- Discussions with principals, establishment of consensus/decisions
- Preliminary conceptual presentations
- Business pro forma and Business Plan development and presentation
- Product conceptual representation
- Preliminary estimates of equipment, construction, and development budget
- Recommendation of appropriate system and components
- Definition of labor requirements, skill level required for system operation
- Safety systems, materials handling, gases, liquids, solids, storage and treatment
- Guidance and materials for public information
- Information kits for environmental action respondents
- Workshop in BioConversion principles and rationale
- Startup timeline, labor and time required for startup of systems
- Provision of startup team for the duration period to be determined
- Commissioning and startup operation
- Technical support/on-call O&M technician
- Development of maintenance program for anaerobic systems
-
Design
- Preliminary design of BioConversion vessels, culture systems, ponds, lagoons
- Design of internal components, configuration, materials of construction
- Design of system components, preferences for flows and sizes
- Design of integrations between BioConversion and peripheral systems
- Provide operational parameters, limits and designs to engineering/ construction firm for estimation and documentation
-
Public Policy and Planning
- Public information meetings
- Briefing of commissions, councils, departments
- Teaching of BioConversion principles
- Development of animated cartoon script for teaching children and public at large about BioConversion
- Contested hearings regarding existing problems, systems, and solutions